
Open return closed section tunnel. 3-component underfloor balance. Additional equipment includes Lavision PIV system FoV 100x100mm, Dantec Constant Temperature Anemometer, 2x64 channel Chell MicroHD Pressure Scanner, 6-component internal balance, Traverse mounted Pitot tube / hotwire. Turbulence Intensity = 1.0%.